Pre-construction plinth treatment creates a protective barrier at vulnerable plinth and soil-contact areas, helping reduce termite entry into the structure. Suitable treatment is applied around plinth filling, foundation edges, joints, and construction interfaces to support long-term protection against termite activity. Plinth assessment • preventive treatment • entry-point protection • barrier management • quality monitoring protect the plinth. Reduce termite risks. Build with confidence.